Which Records Should a Landlord Review for Alterations Made by a Tenant?

Real Estate
To assess alterations made by a tenant, assemble the lease, written permissions, evidence of the actual work and the municipal file together. A landlord’s consent does not establish planning compliance or settle all cost and damage issues at the end of the tenancy. Identify the question answered by each document.
Establish the Timing and Scope of the Work
Compare the premises at the start of the lease with their current condition. Partition walls, installations, façades, wet areas, balconies and changes of use raise different issues. Record who requested and commissioned the work, who contracted with the contractor and who paid. Differences between the tenant’s account and the drawing or quotation approved by the landlord can be listed separately.
- The original lease, annexes, entry record and inventory.
- Permissions, protocols, plans, specifications or quotations signed by the landlord.
- Dated before-and-after photographs and existing technical reports.
- Contractor agreements, invoices and payment records.
- Building permits, approved plans, alteration documents and municipal correspondence.
- The management plan, relevant resolutions and consent records if common areas are affected.
What Does the Written Consent Cover?
Under Article 321 of the Turkish Code of Obligations, a tenant may make improvements and alterations with the landlord’s written consent. Where consent was given, a separate written agreement matters to any requirement to restore the former condition. Unless otherwise agreed in writing, the tenant cannot claim the increase in value resulting from consented alterations. Read the permission’s scope, removal obligations, ownership, cost allocation and return arrangements together.
Preserve complete emails or messages, attachments and sender details. Whether they meet the written-consent or separate-agreement requirement depends on their contents and the applicable form rules. The existence of correspondence alone does not establish approval of every alteration actually carried out.
Consent, Permits and Technical Assessment
Article 21 of the Zoning Law regulates the permit requirement for changes to permitted buildings and specified repair exceptions. Calling work an “alteration” does not resolve its classification under those provisions. Private consent does not replace a required administrative permit. Work affecting common areas or the main structure also calls for consideration of the Condominium Ownership Law.
Legal review alone does not establish structural effects or conformity with approved plans. Where an architect or engineer is needed, the technical findings are related to the contractual and permission documents. If a municipal report, fine or demolition order has been issued, its addressee, alleged act, date and service record require separate attention. The landlord–tenant allocation of costs and the administrative measure do not necessarily produce the same outcome.
Prepare the Next Request Through Evidence
State whether the objective is completion of the work, restoration, repair of damage or return of the premises at lease end. Preservation of the existing condition and any appropriate formal recording of evidence should be considered before repairs. If a notice or termination is contemplated, the lease type, breach and statutory conditions require assessment. An alteration does not automatically establish a termination ground or place every cost on one party.
Related Guides and Services
Legal Sources
Code of Obligations No. 6098, Articles 321 and 334–335; Zoning Law No. 3194, Article 21; Law No. 634, Article 19. Legislation checked: 16 November 2026. Official legislation is in Turkish.