If a road, electricity line or public facility has been built on your property, organise the initial file around four questions: which area is used, which public body is responsible, when did the interference begin and is there an expropriation or other rights document? Matching the physical situation with current title and cadastral records is the first step in identifying the legal route.
Match the Property with the Area Used
Alongside current title, earlier parcel numbers, subdivision or readjustment records and transactions involving previous owners can help. If the current block or parcel number has changed, establish which new parcel corresponds to the earlier interference. Include documents connecting entitlement through inheritance or transfers where relevant.
- Cadastral plans, parcel diagrams, coordinates and existing surveys.
- Dated photographs showing the road, utility line, building or facility and its approximate boundary.
- Existing setting-out documents, survey reports, aerial photographs and site-inspection records.
- A short explanation of the area used and the effect on the remaining property.
Your own markings on a map can help explain the circumstances. Where necessary, an authorised technical assessment verifies whether the used area matches the registered property and any easement boundary.
Records Showing the Authority’s Legal Basis
Collect expropriation decisions, purchase or settlement records, court decisions, deposit-account information, payments, voluntary dedications and easement documents together. Permission or payment involving an earlier owner can also affect assessment. Besides whether a right appears in the register, its extent must be compared with actual use.
The contractor named on a sign, the commissioning public body and the present operator may differ. Correspondence with the municipality, relevant public bodies and operator, the project name, opening date and official replies help identify the responsible party. The company name on a sign alone does not determine which authority should receive an application.
Why Do the Type and Date of Interference Matter?
Permanent physical public use differs from temporary construction damage, effects of public works on neighbouring land, use by a private person and a public-service designation that exists only in a plan. Land lawfully transferred into public ownership through readjustment requires a different assessment too. Use exceeding an existing easement is examined separately.
Provisional Article 6 of Law No. 2942 provides special conditions and pre-action settlement for the specified physical takings during 9 October 1956–4 November 1983. Provisional Article 20, added in 2026, contains separate provisions for land physically dedicated to public services up to 8 October 1956. Older roads and facilities therefore cannot all be assessed under one deadline or compensation rule. Official records of first use, old photographs, earlier applications and judgments are particularly useful.
How Can You Organise the Application File?
Arrange documents under title and parcel history, physical use, administrative measures and earlier applications. Make a dated chronology identifying the source for each entry; label uncertain dates as approximate. Put complete service documents, earlier proceedings and payment records at the beginning. A file-specific assessment can then identify the nature of interference, possible claims, application conditions, jurisdiction and technical evidence required.
Legal Basis
Expropriation Law No. 2942 and Zoning Law No. 3194 are assessed together with the dates of the measure and interference.