Legal Insights — EN

Which Documents Should Be Collected After a Risky-Building Notice?

Which report, notice, title and owners’ decision documents should be collected after a risky-building notice in Turkey? A focused document guide.

Process Guide · Content checked: 15 November 2026

After a risky-building notice, first identify the particular act and bring the assessment, title and notification records into one file. A phone message or a single photograph of a notice at the entrance may not establish its legal basis or the starting date of a time limit. Risk assessment, evacuation or demolition and the owners’ redevelopment decision require separate documents.

Identify the Document Before Choosing a Response

Record its heading, issuing authority, reference number and date. What you have received may be a technical report, notification of a risk assessment, an evacuation measure, a meeting invitation or a contractor’s agreement. Being part of the same project does not give all of these documents the same remedy or time limit.

Keep and share the full document with all annexes. An emailed or messaged copy should be considered alongside the official announcement and the record held in the administrative file. List documents you have not obtained separately; their absence from your own file should not be treated as proof that a time limit has not started.

The Initial Document List

  • Property: Current title records, block and parcel, unit identification, owners and shares.
  • Assessment: The risky-building report and annexes, and correspondence concerning its review by the authority.
  • Notification: The mukhtar’s-office announcement, posting and removal records, the record posted on the building, e-Government entries and any electronic service records.
  • Representation: Powers of attorney; if an owner has died, documents establishing inheritance and authority to represent the estate or heirs.
  • Later acts: Any evacuation or demolition notice, meeting invitation, signed decision and proposed agreement.

When Does the Fifteen-Day Technical Objection Period Start?

Under the Directorate of Urban Transformation’s current process guidance, a risky-building determination is deemed served on the final day of the announcement at the relevant mukhtar’s office. A building owner or legal representative may object within fifteen days from that date to the relevant Urban Transformation Directorate or the competent administration where authority has been delegated. A technical committee reviews the report against the applicable risk-assessment principles.

Check the applicable period separately for an evacuation notice, a share-sale announcement or another act. The subject of the objection, the applicant’s capacity and the basis of notification must be checked separately. Living abroad or viewing the e-Government entry later does not automatically move every time limit to that later date.

Separate the Technical File from the Legal Questions

Questions about samples, calculations, the structural system or an on-site examination require the relevant technical expertise. Which building and owners are covered, notification records, representation and the appropriate subsequent application raise legal questions. A lawyer’s review does not replace engineering assessment, and a technical report does not by itself resolve service or authority issues.

A Meeting Invitation Is Not a Risk-Assessment Notice

Keep the invitation to a meeting on the new project separately. The Annex-12 invitation and meeting documents introduced by the amendment of 4 February 2026 do not replace a technical objection to the risk-assessment report. They concern the later file for owners’ decisions, proposed terms and any share sale. If those stages have begun, connect their documents in chronological order.

The Next Review

Start with the property identification, the full notice and the latest date you know. An urban-transformation review can first establish an act-and-date table. A demolition measure requires a separate assessment of litigation and suspension. If a share sale is proposed, examine the valuation and sale file separately.

Legal Basis and Currency

Reviewed on 15 November 2026. Principal sources are Law No. 6306, its Implementing Regulation and the amendment of 4 February 2026. Process and form information was checked against the Directorate of Urban Transformation and its notice on the updated annexes. The legislation is in Turkish.