Which Documents Are Needed to Strengthen a Risky Building?

Strengthening requires coordinated technical findings, the appropriate owners’ decision, a project and permit within the applicable timetable.
Architectural plans and a residential facade illustrating urban transformation review

Real Estate

Owners seeking to strengthen a risky building instead of demolishing it should prepare the technical-feasibility assessment, owners’ decision, strengthening project and permit process together. Under Article 8(7) of the Implementing Regulation of Law No. 6306, these steps must be completed within the period granted for demolition. Merely notifying an intention to strengthen or consulting an engineer does not replace them.

Which Building and Proposal Does the Technical Assessment Cover?

The initial file should contain the risky-building report and annexes, existing structural records, approved project, permit and any earlier alteration documents. The relevant technical professional must assess whether strengthening is feasible and the extent of the proposed intervention. Differences between the actual building and approved plans, including later additions, need separate explanation.

The technical work should address cost and conditions of use during construction. Legal review does not replace engineering calculations or a technical safety assessment. It connects the identity of the building covered by the report with the decisions, permissions, notifications and time limits required.

Prepare the Owners’ Decision Under the Applicable Rule

Article 19(2) of the Condominium Law addresses written consent from four fifths of all unit owners for works to common parts. The statutory exception must also be considered where a court has established that strengthening the main building is necessary: owners’ consent is then not required for strengthening in accordance with its project and technical requirements. An ordinary privately commissioned report is different from that judicial determination.

Include the current owners’ list, title records, attendance and representation documents, signatures and the supporting technical assessment. The decision should define the works, project, funding and authority of those arranging implementation. The share-based simple-majority calculation used for redevelopment under Law No. 6306 does not remove the need to examine the separate requirements for a strengthening decision.

Match the Project and Permit File with the Works

A strengthening project and a permit under the zoning legislation are required. Article 55(17) of the Planned Areas Zoning Regulation provides a particular permit file for buildings compliant with the legislation in force at their first permit date, where only the structural system will be strengthened and no other substantial alteration is undertaken. Establish with the competent authority whether the building and proposed works meet those conditions.

  • A land-register record or the document accepted in its place in exceptional cases.
  • The structural project supporting strengthening.
  • An architectural project if architectural changes beyond necessary structural cross-section changes are required.
  • Contractor and site-supervisor documents.
  • Building-supervision or technical-responsibility documents, according to the regime applicable to the building.

The same list should not be assumed sufficient for interventions outside this particular procedure or buildings governed by another legal regime. The existing permission status, features requiring protection and other permissions must be identified for the file. Approval of the project and conformity of the actual works with that project require separate checks.

Time Limits, Implementation and the Land-Register Notation

Keep the complete evacuation/demolition notice and announcement and service records. Put the dates for the technical assessment, decision, project and permit on one timetable. Strengthening must be completed within the period set by the permitting authority according to the nature of the works. After completion, apply to the relevant Directorate or delegated administration for removal of the risky-building notation. A private report does not automatically remove the entry.

A strengthening application or lawsuit should not be assumed to suspend evacuation and demolition automatically. The applicable administrative decision and any judicial stay needed require separate assessment. The works agreement should align the programme, payments, supervision, project changes and completion documents with that timetable.